Micky Dobson, EI

Education and Experience:

UT Martin
BS, Civil Engineering, 2008

University of Tennessee, Design Principles of Erosion Prevention and Sediment Control, 2009

University of Tennessee, Fundamentals of Erosion Prevention and Sediment Control, 2009

Engineer Intern
TN #26618


 

Professional Affiliations:
American Society of Civil
Engineers - Member

Clarksville Young
Professionals - Member


 

Mr. Dobson has one year of full time experience in water and sewer system design and modeling. His work experience with DBS and Associates includes surveying, municipal design and planning, and traffic study analysis. His experience includes using Microstation and Geopak design software and WaterCAD modeling software.

Prior to working for DBS and Associates, Mr. Dobson worked in construction. His experience included site layout, excavation, concrete forming and rebar placement, and concrete placement and finishing. This experience will aid Mr. Dobson in his current role assistant Project Manager. He has an insight into the constructability of a Project and will work to alleviate potential problems before they occur.

The following summaries demonstrate his experience with related projects:

 


Hemlock Semiconductor LLC Sewer
Clarksville, TN 2009

Project designer for the Hemlock Semiconductor LLC Sewer Project located in the Megasite Industrial Park. Extensive project including 1.1 MGD submersible lift station, approximately 17955 L.F. gravity sewer, approximately 30085 L.F. force main, water and gas line service to the lift station site, and associated grading and erosion control measures. This project involved the study of the existing conditions and capacities, future sewage flows due to growth, and recommendations for future upgrades and designs. Assisted in the planning and plans preparation of the project route and easement acquisition.

 

Governor’s Square Lift Station Replacement
Clarksville, TN 2008

Project designer for the Governor’s Square Lift Station Replacement near Governor’s Square Mall. Project consisted of new wet well with 2 submersible sewage pumps, and a new force main tying into a existing sewer system. Assisted in the design and analysis of the lift station and all associated appurtenances. Performed various calculations involved in the analysis of the pumping station and was involved with the specifications and design report for the project.


Moore Day Care Traffic Assessment
Clarksville, TN

Assisted in the analysis of the potential traffic impacts that would occur with the proposed rezoning and development of a portion of a parcel on Rossview Road. Completed trip generation calculations of various land uses to analyze the amount of traffic that can be generated in the proposed rezoning.


Oak Street Lift Station Relocation
Clarksville, TN

Project designer for the Oak Street Lift Station Relocation in a suburban area. Project consisted of new wet well with submersible pumps, approx 400 L.F. gravity sewer, approx 180 L.F. sewer force main, emergency diesel powered pump, and paved access drive to site location. Performed various calculations involved in the analysis of the lift station. Designed site layout and grading and erosion control plans, and was involved with the specifications and contract documents for the project.


Callis Hills Apartments
Clarksville, TN

Utilized Watercad to model and evaluate the proposed water system for the Callis Hills Apartments complex. Used steady state and fire flow analysis to review the domestic and fire demand effects on the proposed system.

 

© 2009 DBS & Associates, Inc.