Mr. Hammond
has over 15 years experience in boundary, topographic,
transportation route, as-built, ALTA/ACSM, and construction
surveying,
He is proficient with both conventional and GPS systems.
The following summaries demonstrate his experience with
surveying projects:
State
Route 65,
Robertson County, TN 2005-2006
Survey Party Chief for collection of field data. The project
consisted of surveying State Route 65 from Old Highway 431
to Walling Road. This project included 4.13 miles of roadway
with eleven side roads (total length 4,650 feet) and 100
tracts. The project required location of all existing hard
stand surfaces, utilities, topographic, and boundary
verification surveying.
State Route 13/149 Survey,
Montgomery County, TN 2006-2007
Survey Party Chief for collection of field data. Survey of
approximately 3.5 miles of roadway with 13 side roads, one
bridge, and 108 tracts. The project required location of all
existing hard stand surfaces, utilities, topographic and
boundary verification surveying.
The Woodlands, 101ST Airborne Division Headquarters
Communities Initiative, Fort Campbell, KY 2007-Present
Provided construction staking for a 260-unit family housing
development. Staking included sanitary sewer, water lines,
underground electrical services, building pads, curb &
gutter, and base stone for roadways.
ALTA/ACSM Survey of the Independence Place Fort Campbell
Patriots, LLC Clarksville, TN 2009
Survey was performed to the 2005 Minimum Standard Detail
Requirements for ALTA/ACSM Land Title Survey as adopted by
American Land Title Association and National Society of
Professional Surveyors. The ALTA/ACSM survey was conducted
for 14 units (228 apartments) with Leasing Office on a 15.34
Acre site.
Construction Layout at Lee Village Sec 1 & 2,
Fort Campbell, KY 2006-2007
Provided construction staking for a 115-unit family housing
development. Staking included sanitary sewer, water lines,
underground electrical services, building pads, curb &