|
Mark
Castellano
Field Crew Chief
Education and Experience:
Applicable Technical Training:
Trimble
Navigation, Ltd. Product Training: Introduction to Post
Processed Surveying
Trimble Navigation, Ltd. Product Training: Real Time (RTK)
Surveying
GP Survey
Trimble Survey Office
Trimble Geomatics Office
Excel
Access
Pathfinder Office
|
Mr.
Castellano has over 18 years experience in boundary,
topographic, and hydrographic surveys. He is proficient with
both conventional and GPS systems, and has experience with
laser scanners.
The following summaries demonstrate his experience with
surveying projects:
British
Petroleum Pipeline Construction Layout & As-Built Survey
Clarksville, TN 2009
Provided temporary benchmarks to facilitate construction of
the re-routing of an eight (8”) inch steel pipeline on site.
Staking included the centerline alignment of said pipeline
and the proposed 50’ pipeline easement. The As-Built Survey
included field run surveys that included location with grade
information of all welds (with corresponding weld number),
all fittings, sags and overbends, all utility crossings on
both side of the pipeline (with clearance of said pipeline
over or under each crossing), final grade over pipeline at
fifty (50) stations, at tie in locations and at PI’s after
pipeline installation had been completed.
Union Carbide ALTA Survey, Clarksville, TN 2009
Survey crew chief for the ALTA survey of the Union Carbide
Plant. The plant encompassed 193 acres. All of the
improvements of the plant were located, including buildings,
water, fire hydrants, sewer, gas, electric, telephone, and
storm drainage.
The Woodlands, 101ST Airborne Division Headquarters
Communities Initiative, Fort Campbell, KY 2007-Present
Provided construction staking for a 260-unit family housing
development. Staking included sanitary sewer, water lines,
underground electrical services, building pads, curb &
gutter, and base stone for roadways.
ALTA/ACSM Survey of the Industrial Development Board for
the Montgomery County Properties, Clarksville, TN 2008
Survey was performed to the 2005 Minimum Standard Detail
Requirements for ALTA/ACSM Land Title Survey as adopted by
American Land Title Association and National Society of
Professional Surveyors. The ALTA/ACSM survey was conducted
for multiple parcels of land covering 2,161.62 Acres.
Construction Layout at Lee Village Sec 1 & 2,
Fort Campbell, KY 2006-2007
Provided construction staking for a 115-unit family housing
development. Staking included sanitary sewer, water lines,
underground electrical services, building pads, curb &
gutter, and base stone for roadways.
|