Employee Profile
Celebrating 20 years of excellence
1988 - 2008                                               About Us l Services l Projects l Home
330 North Second St.
Clarksville, TN 37040
Toll Free 866-265-4259

   
ph (931) 647-6959
fax (931) 647-7135
 

 

 

Mark Castellano
Field Crew Chief

Education and Experience:

Applicable Technical Training:

Trimble Navigation, Ltd. Product Training: Introduction to Post Processed Surveying

Trimble Navigation, Ltd. Product Training: Real Time (RTK) Surveying


GP Survey
Trimble Survey Office
Trimble Geomatics Office
Excel
Access
Pathfinder Office

 

Mr. Castellano has over 18 years experience in boundary, topographic, and hydrographic surveys. He is proficient with both conventional and GPS systems, and has experience with laser scanners.

The following summaries demonstrate his experience with surveying projects:

 


British Petroleum Pipeline Construction Layout & As-Built Survey
Clarksville, TN 2009

Provided temporary benchmarks to facilitate construction of the re-routing of an eight (8”) inch steel pipeline on site. Staking included the centerline alignment of said pipeline and the proposed 50’ pipeline easement. The As-Built Survey included field run surveys that included location with grade information of all welds (with corresponding weld number), all fittings, sags and overbends, all utility crossings on both side of the pipeline (with clearance of said pipeline over or under each crossing), final grade over pipeline at fifty (50) stations, at tie in locations and at PI’s after pipeline installation had been completed.


Union Carbide ALTA Survey, Clarksville, TN 2009
Survey crew chief for the ALTA survey of the Union Carbide Plant. The plant encompassed 193 acres. All of the improvements of the plant were located, including buildings, water, fire hydrants, sewer, gas, electric, telephone, and storm drainage.


The Woodlands, 101ST Airborne Division Headquarters Communities Initiative, Fort Campbell, KY 2007-Present
Provided construction staking for a 260-unit family housing development. Staking included sanitary sewer, water lines, underground electrical services, building pads, curb & gutter, and base stone for roadways.


ALTA/ACSM Survey of the Industrial Development Board for the Montgomery County Properties, Clarksville, TN 2008
Survey was performed to the 2005 Minimum Standard Detail Requirements for ALTA/ACSM Land Title Survey as adopted by American Land Title Association and National Society of Professional Surveyors. The ALTA/ACSM survey was conducted for multiple parcels of land covering 2,161.62 Acres.


Construction Layout at Lee Village Sec 1 & 2,
Fort Campbell, KY 2006-2007

Provided construction staking for a 115-unit family housing development. Staking included sanitary sewer, water lines, underground electrical services, building pads, curb & gutter, and base stone for roadways.
 

© 2009 DBS & Associates, Inc.

About Us l Services l Projects l Home