James C. Fielder, PE

Education and Experience:

University of Memphis
BS, Civil Engineering, 1999

Professional Engineer
TN #107734
KY #24387
AL #27644-E
MS #17722

University of Tennessee
Design Principles of Erosion Prevention & Sediment Control, 2005

University of Tennessee
Fundamentals of Erosion Prevention & Sediment Control, 2005

Professional Affiliations:

American Society of Civil Engineers - Member

Society of American Military Engineers - Member

NCEES - Member

Mr. Fielder has sixteen years experience in civil engineering design, management, and construction of Commercial, Industrial, and Transportation Projects. His professional experience includes Master Planning, Project Feasibility Studies, and Site Design.

 As a principal/project manager and Commercial Department head, Mr. Fielder consults with clients to make the best use of their resources in developing an efficient project.  He and his staff have expertise in completing all phases of a project, from feasibility and permitting phases through construction and project closeout. 

 The following summaries demonstrate his experience with related projects:


Department of Defense Projects
Battle Command Training Center (BCTC)
Ft. Campbell, KY
Ft. Benning, GA
Ft. Sam Houston, TX

Civil Designer and Project Manager for new Battle Command Training Centers at U.S. Army facilities across the southeastern United States.  Projects have ranged in size and complexity from an eighteen-acre site at Fort Campbell, Kentucky to a one-acre site at Fort Sam Houston, Texas.  Provided complete civil site design packages for contractors at each location and for the U.S. Army Corps of Engineers.  Site design packages included site layout, site grading, drainage and erosion control plan, and site utility plan.

Industrial Rail Spurs
Clarksville, TN 2009

This includes: Avanti Rail Spur and the Industrial Rail Extension. Avanti Rail Spur included design and placement of 2,437 linear feet of rail spur to the Avanti Manufacturer’s site. Industrial Rail Extension included the design and placement of 4,455 linear feet of railroad expansion to the industrial park.Mr. Fielder was the Lead Civil Designer for these rail designs and provided a complete civil site design package for the contractor that included plan, profile, and proposed layouts and proposed cross sections.

Sanderson Pipe Corporation
Clarksville, TN, 2007 - 2008

Project Manager for a 198,000 square foot manufacturing facility located on a 55-acre site in the Montgomery County Industrial Park.  Mr. Fielder provided a complete civil site package as part of a design-build project that included site review, preliminary site layout, site grading, drainage & erosion control plan, site layout and staking plan, site utility plan and landscape plan.  The project required maximizing plant and product storage areas within a site that required discharge of storm water to a detention area adjacent to an environmentally sensitive wetland.  The project also included a rail spur for the purpose of delivering production materials directly from rail cars and into the plant.

Rossview Elementary School
Clarksville, TN, 2008

Civil Designer for a 103,083 S.F. new Elementary School and Softball Field. This project also included the design and placement of parking areas, site grading, drainage and utilities to accommodate the site. Provided a complete civil site design package for the contractor that included a site layout, site grading, drainage and erosion control plan, and site utility plan.

West Creek School Complex
Clarksville, TN 2005 - 2009

The Complex included West Creek High School, West Creek Middle School, West Creek Elementary School, West Creek School Complex Bus Depot and West Creek Coyote Trail Roadway Design. This project consisted of the placement of 100,908.00 S.F. Elementary School building, 101,427.00 S.F. Middle School building and 260,185.00 S.F. High School building and 0.77 miles of roadway on a 112 acre site. This project included the placement and design of parking areas for each school as well as athletic fields for the high school. This included a 300 meter track, field events, baseball field, softball field, tennis courts, soccer field and football field. The school complex also included bus depot that will accommodate 100 school buses. Mr. Fielder was the Lead Civil Designer for this School Complex Design and provided a complete civil site design package for the contractor that included a site layout, site grading, drainage and erosion control plan, site utility plan, and landscape plan.
 

Colleges/ Universities -2007-2009
Austin Peay State University & University of Tennessee at Martin
Civil Designer for the following projects located on the Austin Peay State University Campus: Chemical Engineering Technology Facility, Fort. Campbell Classroom Center and APSU Outdoor Pool.

The Chemical Engineering Technology Facility included demolition of an existing parking lot area and adding a 13,441.00 S.F. building to the site. This project included site grading, drainage and utilities to accommodate the site.

The Fort Campbell Classroom Center included placement of an 8,937.00 S.F. building on 1.16 acre site by abiding by the Unified Facility Code Manual, Antiterrorism Force Protection Guideline and the AEC standards. It also included site demolition, site grading, drainage and utilities to accommodate the site.

The APSU Outdoor Pool included design and placement of a 68.0 ft x 77.0 ft pool with bathrooms and a pump house building on site. It also included site demolition, site grading, drainage and utilities to accommodate the site.

At the University of Tennessee at Martin, the Recreation and Wellness Facility included placement of 72,949.00 S.F. building and parking lot areas on a 10.5 acre site. This project included site demolition, site grading, drainage and utilities to accommodate the site.


Other Commercial and Industrial Sites 2002-2009
Wyatt Johnson Mazda, Mathews Nissan, Hilton Garden Inn, Comfort Suites Inn, Pizza Huts (4), Sonic Restaurant (4), Dairy Queen, Remax Northstar, Fort Campbell Federal Credit Union Parking Expansion, Fre Resources, Civitan Park Ball Field Renovations, Woodlawn Park Renovations, Daycares (5), Hamilton-Young Medical Office Building and Clarksville Professional Park Lot 2 Medical Office Building. Mr. Fielder has Managed and Designed numerous other commercial and industrial projects.


All of the above projects include staking plans, utility plans, grading plans, demolition plans and landscape plans. Each project was taken through the appropriate approval process for permitting of the project. This is to include but not limited to regional planning commission, local utility district, state fire marshal, local street or highway department, city and/or county building and codes department, groundwater protection and state highway department.

 