Employee Profile
Celebrating 20 years of excellence
1988 - 2008                                               About Us l Services l Projects l Home
330 North Second St.
Clarksville, TN 37040
Toll Free 866-265-4259

   
ph (931) 647-6959
fax (931) 647-7135
 

 

 

Jeremy Harwell, EI

Education and Experience:

University of Tennessee Martin
BS, Engineering (Civil), 2002

Murray State University
BS, Environmental Engineering Technology, 1996


Applicable Technical Training:

Geopak Drainage
Geopak Survey/Site Training
Microstation & Geopak Roadway Training
US Corps of Engineers Wetland Delineation Training

 

Mr. Harwell has one year of full time experience as an assistant project manager in the Design and Planning of Commercial and Utility Developments. His experience includes using Terramodel, Microstation and Geopak design software, and SewerCAD modeling software. His work experience also includes Hydrological Analysis, Preliminary Layouts, Site/Project Design, Cost Analysis, topographical surveys, as-builts, and construction staking.

The following paragraphs demonstrate Mr. Harwell’s experience at DBS & Associates.
 


Hemlock Semiconductor LLC Sewer
Clarksville, TN, 2009

Assistant Project Manager and Project Designer for the grading, water and sewer system design, utility layout, and permitting for the Hemlock Semiconductor LLC Sewer Project located in the Megasite Industrial Park of Clarksville, Tennessee. Extensive project including approximately 17,955 L.F. of gravity sewer, approximately 30,085 L.F. of forcemain, approximately 2,000 L.F. of water line and service, approximately 800 L.F. of gas service, a 1.1 mgd submersible, individual Aquatic Resource Alteration Permit, ARAP, consisting of nine stream crossings, and associated grading and erosion control measures. Created sewer models of the proposed design and provided detailed analysis. This project involved the study of the existing conditions and capacities, future sewage flows due to growth, and recommendations for future upgrades and designs. Assisted in the planning and plans preparation of the project route and easement acquisition.
 

Industrial Rail Extension
Clarksville, TN, 2009

Project Designer for the grading, retention, storm sewer design, rail alignment/layout, and permitting for the Railroad. The project included a 1,500 acre hydrology analysis, 5,356 L.F. of railroad alignment/design, re-design of the intersection between Steel Stock and Dunlop Road, and the design of a 461,329 cubic yd. retention basin.

Patonis Daycare in Professional Park
Clarksville, TN, 2009

Project Designer for the grading, detention, water quality, storm sewer design, water and sewer system design, utility layout, and permitting for the 9,957 sq ft Patonis Daycare facility unit in Clarksville, Tennessee. The project included design of a 0.8 acre layout on a 1.1 acre plat.

Civitan Park
Clarksville, TN, 2008

Project Designer for the grading, retention, storm sewer design, utility layout/design, and permitting of the Civitan Park project. This project consisted of the design of a new sports complex, with eight baseball/softball fields, concessions, score boxes, two pavilions, and a maintenance building on 28.5 acres in Clarksville, Tennessee.


 

© 2009 DBS & Associates, Inc.

About Us l Services l Projects l Home