|

Victoria
Sutherland
Education and Experience:
Kentucky State University AAS,
Computer Aided Drafting, 1990
Applicable Technical Training:
AutoCAD
Mechanical Desktop
Terramodel
Microsoft Excel
Microsoft Word
Arc View
Adobe Acrobat
|
Civil
Engineering and surveying and 1 year of Architectural
drafting. Her experience includes subdivision planning and
design, commercial lot planning and design, drafting of
property boundaries, topographic surveys, grid maps and soil
maps. Residential construction plans have included grading
plans, site plans, utility plans, roadway plans, and general
layouts. She also has been involved in writing numerous
property descriptions.
The following summaries demonstrate her
experience with related projects:
Highland
Row
Clarksville, TN 2006
Drafting Technician for a project that included site design
of 14 condo lots on 3 acres, and assisted in the completion
of construction drawings. Responsible for property
descriptions for bank and owner transfers, the utility
asbuilts and, the final plat approval for recording at the
Register of Deeds.
Hickory Wild
Clarksville, TN 2005
Drafting Technician for the project that included site
design of 540 lots on 246 acres, assisted in completion of
construction drawings. Responsible for property descriptions
for bank and owner transfers, utility as-builts, and the
final plat approval for recording at the Register of Deeds.
Robin Lynn Hills
Montgomery County, TN 2001
Site Designer for the preliminary site layout
containing the septic areas and the drafting
technician for the construction plans for the
77-lot subdivision. Drafting Technician for the
utility as-builts and the final plat approval of
sections 1 and 2 for recording at the Register of Deeds.
Timber Springs
Clarksville, TN 2004
Drafting Technician for the preliminary site layout and the
construction plans for a 629 subdivision. Drafting
Technician for the utility as-builts and the final plat
approval of sections 1 and 2 for recording at the Register
of Deeds.
Bristol Park
Clarksville, TN 2001
Drafting technician for the construction plans for a
244-unit multi family complex.
Copperstone Nashville
Colensville, TN 1999
Drafting Technician for the preliminary layout and Edmonson
Creek cross sections for a 119-lot subdivision.
Greenfield Ridge Sections 3 & 4
White Bluff, TN 1999
Drafting technician for the construction plans for a 103-lot
subdivision. Responsible for the final plat approval of each
section for Register of Deed approval.
Fairview Estates
Fairview, TN 1998
Drafting technician for the construction plans for a 41-lot
subdivision.
Autumnwood Farms
Clarksville, TN 1998 – 2005
Drafting Technician for the boundary and topographic
surveys, along with the design layout of 544 acres into 1040
residential and commercial lots. Drafting Technician of the
construction plans for the first 4 phases and responsible
for the utility asbuilts and final plat approval of each
phase for Register of Deed approval.
|